About the Project
Under the J110 contract, DL E&C is responsible for the design and construction of the elevated Jurong East Station, Viaduct, and Addition & Alteration (A&A) works to the existing interchange station on the North-South and East-West Lines.
This project enhances connectivity between existing and upcoming transit systems, ensuring seamless integration for future commuters in one of Singapore’s busiest rail hubs.
Handback Engineer Provision for J110 Jurong East MRT Viaduct Jacking up and lowering down for bearing replacement works.
Handback Engineer also record the pre and post track geometry and advises the temporary speed restrictions (If required) accordingly for safe operation of trains.
Handback Engineer will also lead any contingency measures to ensure the track is safe operate trains.