Handback Engineer Services for J110 MRT Viaduct Bearing Replacement

01
About the Project
  • Under the J110 contract, DL E&C is responsible for the design and construction of the elevated Jurong East Station, Viaduct, and Addition & Alteration (A&A) works to the existing interchange station on the North-South and East-West Lines.
  • This project enhances connectivity between existing and upcoming transit systems, ensuring seamless integration for future commuters in one of Singapore’s busiest rail hubs.
  • Handback Engineer Provision for J110 Jurong East MRT Viaduct Jacking up and lowering down for bearing replacement works.
  • Handback Engineer also record the pre and post track geometry and advises the temporary speed restrictions (If required) accordingly for safe operation of trains.
  • Handback Engineer will also lead any contingency measures to ensure the track is safe operate trains.